Construction of Large Factory Units: Site F Ryde Business Park

Factory Units 1

From start to finish. 1st day on site.

Finished product.

Again when working on the site F factory units, we came across very bad ground conditions namely running sand as pictured in these two photographs.

Our solution was to get in and install a ground dewatering system as shown in these two pictures. This enabled us to continue the ground works to the two factory units.

 